Hardware Lead Times
Transformer and switchgear shortages are pushing critical equipment deliveries 18-24 months out in some markets, with no clear resolution in sight.
Search
Source: Bloomberg, Project Braid Reporting, September 2026
Some delays you can’t control. Labor is the one you can.
Bloomberg’s reporting points to four compounding factors behind the industry’s surge in missed timelines. Three of them are largely out of your hands. One isn’t.
Transformer and switchgear shortages are pushing critical equipment deliveries 18-24 months out in some markets, with no clear resolution in sight.
Grid interconnection delays and utility capacity limits, including ERCOT congestion in Texas, are stalling site readiness even after construction milestones are met.
Political opposition, zoning challenges, and permitting backlogs add unpredictable delays at the front end of programs nationwide.
The build rate has outpaced the available qualified labor pool. Programs don’t stall because the work is too complex. They stall because the right crews aren’t there when the schedule demands them.
Velociti and CCCI bring 70 years of combined data center implementation experience to a certified technician network spanning the entire United States, with crews who are already trained, already certified, and already active in the markets where the builds are happening.
Learn more about our data center services
From first mobilization to final commissioning, we cover the full low-voltage scope, so you’re not stitching together multiple subs to hit a milestone.
Copper and fiber pathways installed and tested to spec, from the MDF to the cabinet.
Outside and inside plant fiber, terminated and spliced at scale.
Equipment installed, seated, and labeled, ready for power-on.
PDUs, busway, and whips installed to the one-line, verified before energization.
Building and power management systems wired for full visibility from day one.
Turnover documentation built as we go, not reconstructed after the fact.
Progress tracked by building, room, rack, and fiber, visible to your team as it happens.
A certified technician network built to mobilize anywhere in the country, without a ramp-up period. The ten markets highlighted below have active builds running right now. Every other state is already staffed and ready to deploy just as fast.
Don’t let your next schedule slip be a labor problem. Tell us what you have coming and we’ll tell you quickly whether we’re the right fit.
Request a ConsultationNo pitch. Just a straight conversation about your program.